Manufacturer · ceilings
Zentia (legacy specifications)
Legacy Armstrong UK and Zentia ceiling specification-substitution guidance
Zentia Limited and Zentia Profiles entered administration on 8 June 2026, and production ceased. This page preserves historical project and product-reference information and explains how legacy Zentia or Armstrong UK ceiling specifications should be assessed for a controlled substitution. Supply, current compliance evidence and warranty enforceability are uncertain; no insurance-backed standard warranty has been identified.
Zentia Limited and Zentia Profiles entered administration on 8 June 2026, and production ceased. Legacy Zentia and Armstrong UK specifications require a project-specific, controlled substitution assessment; they must not be treated as a route to current supply or warranty cover.
For a detailed walkthrough of the equal or approved substitution process, see Zentia is in administration. Your project specifies Zentia. Here's what happens next..
Legacy Zentia and Armstrong UK records
Zentia was the UK ceiling tile and grid business formerly trading as Armstrong Ceilings UK. The Armstrong UK business was rebranded to Zentia in 2020. Its historical product names include Ultima, Sierra, Dune, Bioguard and Prelude. Older drawings, operation-and-maintenance information and project records may therefore use either Armstrong UK or Zentia names.
Interpath confirms that Zentia Limited and Zentia Profiles entered administration on 8 June 2026 and that production ceased. Availability, supply-chain/compliance evidence and warranty enforceability are consequently uncertain. No insurance-backed standard warranty has been identified.
Assessing a legacy specification
The historic product name is a starting point for understanding an existing ceiling, not a current product recommendation. Identify the original tile, grid, edge detail and performance requirements from drawings, schedules and records. Then ask the project design team to select and approve a replacement using current technical evidence for the proposed complete system.
Substitution should be controlled through the project's normal change-control process. It should address the specific performance and coordination requirements, which may include fire, acoustics, hygiene, humidity, light reflectance, dimensions, edge detail, grid compatibility, loading and service access. Do not rely on historic product literature as evidence for a newly proposed system.
Documented installation record
We have a documented installation record across the Zentia (and historic Armstrong UK) tile ranges. Recent and historic project work includes:
- Ultima OP at the Glenair Mansfield industrial fit-out: premium acoustic mineral fibre tile across the office and meeting space inside the wider industrial envelope.
- Sierra with Bioguard treatment at the Nottingham Trent University Clifton Campus refurbishment: mid-specification mineral fibre with the hygienic treatment specified across catering and student-facing space.
- Dune at the Charnock Hall School in Sheffield: workhorse mineral fibre tile across the education refurbishment programme.
- Dune across the Kia dealership at Burton-on-Trent: workhorse tile across the showroom, customer and back-of-house environments of the automotive retail fit-out.
These are truthful records of completed installations. They should not be read as a claim of current supplier status, availability, recycling arrangements, accreditation or enforceable warranty cover.
Next step for existing ceilings and new work
For an existing ceiling, provide the drawings, photographs, dimensions and any available product records so the original system can be identified. For new work or replacement work, provide the architect's RCP and performance brief. We can help the project team develop a substitution proposal, but approval must rest on current technical evidence and documented project change control.
Selected work
Recent projects featuring Zentia (legacy specifications)
Services
Where Zentia (legacy specifications) systems fit
Suspended Ceilings
Modular grid and tile systems engineered for acoustic, fire and lighting integration.
Dry Lining
Plasterboard partitions, linings and ceilings to specification.
Acoustic Panelling
Wall-mounted absorption that controls reverberation in busy commercial spaces.
Commercial Fit-Out
End-to-end Cat A and Cat B fit-out, managed under one accountable contract.
Partitions
Solid, glazed and demountable partitions for offices, education and healthcare.
Sectors
Where we install these systems
- 01
Education
Schools, colleges and universities: built-environment specialists.
- 02
Offices
Cat A and Cat B fit-out for occupier and landlord projects.
- 03
Healthcare
Hygienic, compliant and durable interiors for clinical settings.
- 04
Retail
Brand-aligned shopfits, refurbishments and rolling programmes.
- 05
Industrial
Welfare, office and operational space inside warehouses and factories.
FAQs
Frequently asked questions
Get in touch
Need to review a legacy Zentia specification?
Send us the schedule and required performance criteria. We will help the project team compare currently supported alternatives and record the approved substitution.
