Burleyfield School: Suspended Ceilings Refurbishment
Suspended ceiling installation across classroom and circulation areas at Burleyfield School, delivering a refreshed, acoustically improved learning environment with a standard mineral fibre grid system.
- Client
- Burleyfield School
- Location
- Stafford
- Completed
- 2025
- Sector
- Education
Client
Burleyfield School
Main contractor
GF Tomlinson
Location
Stafford
Completed
2025
Services delivered
Manufacturers used
Gallery
Case study
Burleyfield School received a suspended ceiling refurbishment across its teaching and circulation areas. The project delivered new mineral fibre ceiling grid and tile throughout, replacing ageing ceiling systems to improve the acoustic environment, light reflectance and the overall condition of the learning spaces.
The brief
School ceiling refurbishment programmes typically run during summer holiday periods or over extended school breaks, with the building handed back to the operator before the new term. The brief at Burleyfield School was to remove and replace the existing suspended ceiling throughout the affected areas, integrating with the existing M&E services above and achieving a consistent, high-quality finish across all zones within the programme.
Working in an educational environment requires a clean, controlled approach to dust management, waste removal and the protection of the existing fabric. All debris from the strip-out was removed from the building before the new installation commenced, and the finished areas were cleaned and handed back in a condition ready for immediate occupancy.
What we installed
A standard exposed T-bar grid with mineral fibre acoustic ceiling tile was installed throughout the classrooms and circulation areas. The mineral fibre tile specification was selected for its acoustic performance: Class C or better sound absorption, high light reflectance, and compatibility with the existing fluorescent and LED luminaire types present in the building.
Grid layout was set out to achieve consistent tile size across each room, with perimeter tiles cut to produce balanced margins at the walls. Service penetrations for lighting, smoke detectors and ventilation grilles were coordinated with the existing services layout above the ceiling, with all penetrations cleanly finished.
Programme
The installation was sequenced across the building's areas to maintain a working zone for following trades and to allow areas to be handed back progressively as works completed. The project was delivered within the agreed programme window without remedial work.
Related projects
More work like this
educationAston Students' Union: Acoustic Rafts and Timber Ceiling Refurbishment
Aston University Students' Union · Birmingham, West Midlands
Phased refurbishment of Aston University Students' Union, Birmingham. Sloped Ecophon Solo acoustic rafts in the upper social space matched to the roof geometry; Hunter Douglas solid linear timber ceiling at ground floor. Works phased around the building's continuous student-facing operations.
View case study
educationBarnsley College: full refurbishment across four levels
Barnsley College · Barnsley, South Yorkshire
A year-long refurbishment of four levels at Barnsley College, delivering suspended ceilings, acoustic hanging panels and a full acoustic package across classrooms, atrium and circulation spaces.
View case study
educationPeterborough College: Acoustic Rafts and Suspended Ceilings
Peterborough College · Peterborough, East of England
Acoustic rafts and suspended ceilings installed across the main atrium and teaching areas at Peterborough College, a further education campus in Peterborough, delivered around the college's operational calendar.
View case study
Get in touch
Looking for similar work in education?
Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.