Case study
The Gym Group Hendon: bank-to-gym conversion with a full acoustic specification
- Client
- The Gym Group
- Location
- Hendon, London
- Duration
- TBC
A former bank building in Hendon, with residential dwellings on the floors directly above. The Gym Group were converting the ground floor to a fully operational gym, and the acoustic and fire separation specification had to work hard from the outset. Eastledge delivered the partition, dry lining, ceiling and sealing package, working within a live fit-out programme run by main contractor Kingfisher Construction.
Client
The Gym Group
Location
Hendon, London
Duration
TBC
The brief
Residential dwellings sitting directly above a commercial gym is a straightforward acoustic problem with no easy answer. The specification had to achieve the required airborne and impact sound reduction performance between the gym floor and the flats above, and it had to be fire-rated to meet the building's compartmentation requirements.
The solution was a tested Hadley system, selected specifically for its combined acoustic and fire performance data. The brief to Eastledge was to install that system accurately, coordinate it with the wider fit-out trades, and maintain a programme that kept pace with the gym opening date.
What we did
Partitions and acoustic dry lining
Metal stud partitions were installed throughout the footprint, with the acoustic specification driving both the framing system and the plasterboard choice. Where the partition adjoins the underside of the structure above, the system was taken to full structural height and fire-stopped at the junction to maintain compartmentation. Siniat plasterboard was used throughout for the lining work.
Suspended ceiling
A suspended ceiling was installed across the main training floor, coordinating with the M&E services and the gym fit-out contractor. Grid setting-out was agreed before hangers went in so services penetrations, lighting positions and equipment drops could all be accommodated without remedial cutting.
Beam casements and bulkheads
Exposed structural steelwork running through the former bank space was cased in dry lining to provide a clean finish and the fire rating required for structural elements. Bulkheads were formed to box in high-level services where these ran beneath the structure.
Fire-rated casements and firestopping
Fire-rated casements were installed at the required locations to maintain compartmentation at penetrations. Firestopping was applied at all service penetrations through party floors and walls, with the specification and products selected in line with the tested system requirements.
How we worked
The gym fit-out involved multiple trades working simultaneously across the floor plate, with Kingfisher Construction managing the programme. Eastledge coordinated closely with the gym equipment supplier and the M&E contractor: ceiling setting-out informed equipment anchoring positions, and service routes were agreed before either trade began work, avoiding rework later in the programme.
Acoustic specification on a project like this requires care at every junction. The continuity of the tested system depends on getting the details right: correct products at penetrations, correct fixing centres, correct junction treatments between floor, wall and ceiling. Our site supervision team managed the installation to the tested system requirements throughout.
Outcome
A working gym in a converted bank building, with a verified acoustic and fire separation specification between the gym floor and the residential dwellings above. The tested Hadley system was installed accurately and the project was handed over on programme with the gym operator's opening date.
The photography was taken after handover with the gym in use. The fit-out serves the building's mixed-use requirements: commercial below, residential above, with the performance specification that both uses require.
Get in touch
Planning a similar project?
We work with estates teams, main contractors and designers across education, healthcare and commercial. Tell us about your brief and we'll come back with a clear next step within one working day.
Related projects
More work like this
leisureRavenshead Leisure Centre: Acoustic Panelling in a Sports and Leisure Facility
Ravenshead Leisure Centre · Ravenshead, Nottinghamshire
Acoustic wall panelling installed across the sports hall and leisure areas at Ravenshead Leisure Centre, Nottinghamshire, to control reverberation in high-volume public-facing spaces.
View case study
retailDunelm Manchester Fort: mezzanine fire ceiling and full suspended ceiling fit-out
Dunelm · Manchester Fort, Manchester
Suspended ceiling fit-out for the new Dunelm store at Manchester Fort, including fire-rated mezzanine underdraw, partition walls and firestopping throughout the retail space.
View case study
industrialFCC Environment: hygienic cladding and suspended ceilings
FCC Environment · TBC
Five specialist trades delivered under Sail Construction at an FCC Environment waste management facility: dry lining, taping and jointing, glazed partitions, suspended ceilings and hygienic wall cladding across both operational and welfare areas.
View case study
Get in touch
Looking for similar work in leisure?
Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.