Case study
Matalan Bangor: fire-rated partitions and FR ceilings
- Client
- Matalan
- Location
- Springhill Retail Shopping Centre, Bangor, Northern Ireland
- Duration
- 14 September to 4 November 2026
Matalan's new store at Springhill Retail Shopping Centre, Bangor, County Down, is a retail fit-out delivered for White Box Interiors. Eastledge was appointed to provide the internal partitions, fire-rated walls, taping and jointing, fire barriers and fire-rated suspended ceilings that close the floor plate and protect the escape and compartmentation lines through the shop.
The package ran from 14 September to 4 November 2026. The photographs show the finished sales floor, the first floor amenity block, and first floor walls built, taped and jointed by Eastledge. A short film of the sales floor is included from the same finished store.
Client
Matalan
Location
Springhill Retail Shopping Centre, Bangor, Northern Ireland
Duration
14 September to 4 November 2026
Main contractor
White Box Interiors
Services delivered
Sector
Sales floor
The finished sales floor has a long run of partitions meeting the fire-rated mineral tile ceiling, with one hour Fireline boxing to the retail columns. The black frames in the aisle are retail fixtures, not Eastledge partitions. The white units in the foreground are retail fixtures, not Eastledge partitions.
Sales floor
The brief
The brief was a complete interiors package for the store, not a single trade visit. Eastledge installed metal stud partitions, including 158 mm one hour fire-rated compartment walls between the mezzanine sales floor and back of house, and 102 mm half hour fire-rated partitions; Securilath security mesh to the manager and cash office; plywood linings to the toilets; one hour Fireline boxing to the retail columns; wall linings to the customer stairs; taping and jointing; fire barriers; and a fire-rated ceiling of Knauf Ceiling Solutions AMF Thermatex Fine Stratos one hour FR tiles on fire-rated grid.
That combination is typical of a shop fit-out of this type. The partitions have to reach full height, the fire-rated walls and barriers have to be continuous, and the ceiling has to carry a tested fire rating on a compatible grid. Delivering dry lining, partitions, taping and jointing, fire barriers and the FR ceiling under one contract kept those junctions in one team.
Fire-rated partitions, dry lining and taping and jointing
Full-height metal stud partitions were set out across the floor plate, including one hour fire-rated compartment walls between the mezzanine sales area and back of house, and half hour fire-rated partitions where the fire strategy required them. The frames were taken to the structure above, boarded, and jointed so the fire-rated linings remained continuous at heads, abutments and openings.
The same package included security mesh to the manager and cash office, plywood linings in the toilets, one hour Fireline boxing to retail columns, and wall linings to the customer stairs. Taping and jointing was carried out as part of the works, so the boarded walls were finished by the same team that set out the stud and linings.
Fire-rated ceilings and fire barriers
The ceiling specification was Knauf Ceiling Solutions AMF Thermatex Fine Stratos one hour FR tiles on a matching fire-rated grid. Over 850 m² of this FR ceiling was installed, largely as a lay-in ceiling to the underside of the mezzanine and across the ground floor sales area, with a further ceiling in the amenity block on the first floor. The sales floor ceiling is at 3000 mm. The first floor amenity block, including the corridor, office, staff kitchen, cleaner's room and accessible WC, has a 2400 mm suspended ceiling. About 80 m of fire barriers were installed in the ceiling void.
The grid was set out so lighting, services and partition heads could be coordinated before the tiles went in. Bulkheads and a plasterboard downstand with a 20 mm shadow line were formed around the atrium and the new stair opening, with fire-rated access panels where required. A one hour FR tile on a matching FR grid is only as good as the junctions around it. The partition heads and fire barriers were built to meet that grid, so the ceiling and the fire-rated walls work as one system rather than as two separate trades meeting late in the programme.
First floor amenity
Taping and jointing
First floor walls built, taped and jointed by Eastledge.
Taping and jointing
Challenges
This was a Northern Ireland job delivered with a team based in England, so travel, materials and access had to be planned before work started. A local merchant account was set up so board, grid and tiles could be supplied in Northern Ireland, and power towers and pallet trucks were hired locally.
The fire-rated ceiling and fire barriers had to go in under the mezzanine, with the rated walls, barriers and grid meeting as one system on a retail programme.
The works were complete by 4 November 2026 and handed back to White Box Interiors.
Outcome
Matalan Bangor received a coordinated interiors package: metal stud partitions, one hour and half hour fire-rated walls, taping and jointing, fire barriers, and a Thermatex Fine Stratos one hour FR ceiling on fire-rated grid. That included over 850 m² of FR ceiling and about 80 m of fire barriers, completed in just over seven weeks for a retail main contractor.
The job sits in our retail and shop fit-out work, and it shows that Eastledge delivers this package across the UK, including Northern Ireland. For a sister Matalan store completed in the same period, see Matalan Aylesbury. Further context is on Fire-rated Partitions, Partitions, Dry Lining, Taping and Jointing, Suspended Ceilings and Knauf Ceiling Solutions.
Get in touch
If you are specifying fire-rated partitions, FR ceilings or a full interiors package for a retail fit-out, contact Eastledge. See Fire-rated Partitions, Partitions, Suspended Ceilings, Shop Fit-out and Retail.
Get in touch
Planning a similar project?
We work with estates teams, main contractors and designers across education, healthcare and commercial. Tell us about your brief and we'll come back quickly with a clear next step.
Where this sits
Services, areas and contractor packages
Services on this project
For main contractors
Related projects
More work like this
retailMatalan Aylesbury: fire-rated partitions and FR ceilings
Matalan · Aylesbury
Full-height metal stud partitions, 60 minute and 30 minute fire-rated walls, firestopping and Knauf AMF Thermatex Fine Stratos one hour FR tiles on FR grid at Matalan Aylesbury, delivered for White Box Interiors.
View case study
retailCO-OP retail refurbishment programme: ceilings, partitions and dry lining across five stores
CO-OP Group · Multiple stores, UK
Ceilings, partitions, taping and jointing, fire curtains and dry lining delivered across five CO-OP stores in Swinton, Desford, Matlock, Swallownest and at the University of Leicester as part of the retailer's nationwide rollout.
View case study
retailDunelm, Uddingston
Dunelm · Uddingston, Glasgow
Dry lining, tape and joint, fire-rated MF ceilings and suspended ceilings installed at Dunelm Uddingston. Retail fit-out case study by Eastledge Interiors.
View case study
Get in touch
Looking for similar work in retail?
Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.