The Gym Group's Nuneaton gym occupies the former Carpetright building on Bond Street, Nuneaton, CV11 4FN. The project converted a retail unit into a leisure fit-out on a short programme. Eastledge was appointed by main contractor Kingfisher Construction to deliver the dry lining, partitions and ceiling package.
Work ran from September to October 2026. The photographs here were taken on 13 November, after handover, with the gym branded and equipment in place. Some finishing and fit-out items were still being closed out in the background.
Client
The Gym Group
Location
Bond Street, Nuneaton, Warwickshire
Duration
September to October 2026
Services delivered
Sector
Eastledge involvement
The brief was to form the internal walls, linings and ceilings that turn a former retail shed into a working gym: training floor, entrance, changing rooms and the supporting rooms behind the brand finish. Eastledge installed Hadley C stud, jumbo and I stud, including FR60, and lined the frames with Siniat GTEC dB 15mm, GTEC 12.5mm and moisture board. MF ceilings and suspended ceilings completed the package.
This is the same client and main contractor relationship as The Gym Group Hendon, where Eastledge also delivered partitions, dry lining and ceilings for Kingfisher Construction. Nuneaton is a faster retail-to-leisure conversion, with a short programme and a high volume of short-notice material calls.
Dry lining and partitions

Hadley metal stud formed the partition layout through the building. C stud was used for standard walls, with jumbo and I stud where the height, loading or fire rating required a heavier section, including FR60. That mix allowed the same team to build both ordinary room divisions and the fire-rated walls that sit in a gym of this type.
Linings were Siniat GTEC dB 15mm where a denser acoustic board was specified, GTEC 12.5mm for standard dry lining, and moisture board in the wetter rooms. Taking dry lining and fire-rated partitions together meant the board choice, the stud choice and the head and junction details could be kept in one sequence.
Ceilings
MF ceilings and suspended ceilings were installed to the rooms that needed them, coordinated with the partition heads and the services running through the former retail volume. In the entrance, a blue mesh ceiling was set out on a regular grid above the doors and the lined walls, leaving services visible above while giving the lobby a finished ceiling plane.
The training floor retains the open industrial soffit typical of The Gym Group's conversions, with Eastledge's partitions and linings forming the walls and boxed elements that sit beneath it.

Short-notice material calls
A retail-to-leisure conversion on a September to October programme does not leave much slack. Material calls came at short notice as the layout and finishes were confirmed on site. Eastledge responded to those calls so that Hadley stud, Siniat board and ceiling materials reached the workface without holding the partition or ceiling sequence.
Kingfisher Construction ran the wider programme. Eastledge's package was planned so dry lining, partitions and ceilings could keep pace with the gym operator's opening date, rather than becoming the trade that delayed it.
Outcome
The former Carpetright on Bond Street opened as The Gym Group Nuneaton, with Hadley stud partitions, Siniat linings and the ceiling package in place, completed in September and October 2026. The entrance, changing rooms and training floor walls show the finished interiors after handover.
The job adds a Warwickshire gym to the same operator and main contractor relationship already published at The Gym Group Hendon. It sits in our leisure and shop fit-out work across the West Midlands. Further context is on Dry Lining, Partitions, Suspended Ceilings, Hadley and Siniat.
Get in touch
If you are converting a retail unit to a gym or leisure use, or you need dry lining, partitions and ceilings delivered on a short programme, contact Eastledge. See Dry Lining, Partitions, Fire-rated Partitions, Suspended Ceilings, Leisure and areas we cover in Warwickshire.
Get in touch
Planning a similar project?
We work with estates teams, main contractors and designers across education, healthcare and commercial. Tell us about your brief and we'll come back quickly with a clear next step.
Where this sits
Services, areas and contractor packages
Services on this project
Service pages for this area
For main contractors
Related projects
More work like this
leisureThe Gym Group Hendon: bank-to-gym conversion with a full acoustic specification
The Gym Group · Hendon, London
Bank-to-gym conversion in Hendon with residential dwellings directly above, delivering partitions, acoustic dry lining, suspended ceilings, beam and fire-rated casements, bulkheads and firestopping to a tested acoustic specification.
View case study
retailMatalan Aylesbury: fire-rated partitions and FR ceilings
Matalan · Aylesbury
Full-height metal stud partitions, 60 minute and 30 minute fire-rated walls, firestopping and Knauf AMF Thermatex Fine Stratos one hour FR tiles on FR grid at Matalan Aylesbury, delivered for White Box Interiors.
View case study
retailCO-OP retail refurbishment programme: ceilings, partitions and dry lining across five stores
CO-OP Group · Multiple stores, UK
Ceilings, partitions, taping and jointing, fire curtains and dry lining delivered across five CO-OP stores in Swinton, Desford, Matlock, Swallownest and at the University of Leicester as part of the retailer's nationwide rollout.
View case study
Get in touch
Looking for similar work in leisure?
Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.