Superdrug Newport, Isle of Wight: dry lining, fire-rated partitions and suspended ceilings, St Georges Way, Newport, Isle of Wight. Interior fit-out by Eastledge.

Case study

Superdrug Newport, Isle of Wight: dry lining, fire-rated partitions and suspended ceilings

Client
Superdrug
Location
St Georges Way, Newport, Isle of Wight
Duration
5 to 16 October 2026

The new Superdrug store on St Georges Way, Newport, Isle of Wight, is a retail fit-out delivered for Vale (UK) Ltd. Eastledge was appointed to take the unit from an empty shell through dry lining, partitions, a two hour fire-rated wall, fire curtains, taping and jointing, a frieze, bulkheads, shopfront boxings and suspended ceilings.

The package was completed in ten days on site, from 5 to 16 October 2026. The hero photograph shows the finished shopfront at night. The other photographs show the sales floor and back of house during the works, once the boarded walls had been taped and jointed and the ceiling grid and tiles were going in.

Client

Superdrug

Location

St Georges Way, Newport, Isle of Wight

Duration

5 to 16 October 2026

Main contractor

Vale (UK) Ltd


Sales floor

These photographs show the sales floor as the works went in, once the boarded walls had been taped and jointed and the ceiling grid and tiles were going in.

Sales floor

The brief

The brief was a complete interiors package for a new store, not a single trade visit. Eastledge installed back of house partitions, a two hour fire-rated wall between the sales floor and back of house, perimeter dry lining, taping and jointing, fire curtains, fire batt and seal, a 1200 x 600 suspended ceiling, a frieze, bulkheads, head deflection to the tall separating wall, and plasterboard boxings at the shopfront.

That combination is typical of a new Superdrug, but the Isle of Wight location made the programme tighter than a mainland store. Materials had to travel from the mainland on an artic, with a ferry crossing booked for the delivery, and the interiors package had to be finished in ten days on site.

Our scope

Dry lining, partitions, taping and jointing and the two hour wall

Back of house partitions were set out for the staff rooms, offices, WCs and warehouse spaces. A two hour fire-rated wall separates the sales floor from back of house. The wall is a Tradeline 146 mm I-stud frame, boarded with Siniat Firecheck, taken to the structure above, with head deflection allowed for at the top of the wall. Fire batt and seal were installed at the head.

Perimeter walls on the sales floor were dry lined, and the boarded walls were taped and jointed by the same team that set out the stud and linings.

Suspended ceilings, frieze, bulkheads and shopfront boxings

A 1200 x 600 suspended ceiling was installed across the sales floor and back of house, using TVS White Cleancare Smooth V2 tiles on a Rockfon Chicago Metallic T24 Click white grid. A frieze was formed around the sales floor, with bulkheads and plasterboard boxings at the shopfront.

Fire curtains

Fire curtains were installed as part of the fire strategy for the store, together with the fire batt and seal at the head of the two hour wall.

Taping and jointing

Back of house corridor and the shopfront wall, taped and jointed by Eastledge.

Taping and jointing

Challenges

This was an Isle of Wight job delivered by a team based in Derby, so materials, plant and access had to be planned before work started. The ceiling and dry lining materials were sent from the mainland on an artic, with a ferry crossing booked for the delivery.

Once on site, the package had to be completed in ten days. The two hour wall, fire curtains, taping and jointing, frieze, bulkheads, shopfront boxings and the suspended ceiling all had to meet as one system on a short retail programme.

The works were complete by 16 October 2026.

Outcome

Superdrug Newport received a coordinated interiors package for a new store: back of house partitions, a two hour fire-rated Tradeline and Siniat wall, taping and jointing, fire curtains, fire batt and seal, TVS Cleancare ceilings on Rockfon T24 Click grid, a frieze, bulkheads and shopfront boxings, completed in ten days on site for a retail main contractor.

The job sits in our retail and shop fit-out work, and it adds a new Superdrug store on the Isle of Wight to the wider Superdrug programme. For the Superdrug ceiling and shop fit-out programme, including Brighton and Ilford, see Superdrug retail refurbishment programme. Further context is on Fire-rated Partitions, Partitions, Dry Lining, Taping and Jointing, Suspended Ceilings, Shop Fit-Out, Siniat, Tradeline, TVS Acoustics and Rockfon.

Get in touch

If you are specifying fire-rated partitions, suspended ceilings or a full interiors package for a retail fit-out, including sites reached by ferry, contact Eastledge. See Fire-rated Partitions, Partitions, Suspended Ceilings, Shop Fit-Out and Retail.

Get in touch

Planning a similar project?

We work with estates teams, main contractors and designers across education, healthcare and commercial. Tell us about your brief and we'll come back quickly with a clear next step.

Where this sits

Services, areas and contractor packages

Related projects

More work like this

All projects →

Get in touch

Looking for similar work in retail?

Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.

Request a quote

Pre-filled for Fire-Rated Partitions for Retail in Newport, Isle of Wight.

We'll only use your details to respond to your enquiry.