Case study
Co-op Funeralcare, Mitcham: partitions, dry lining and suspended ceilings
- Client
- Co-op Funeralcare
- Location
- Morden Road, Mitcham, south London
- Duration
- August to November 2026
Eastledge delivered the partitions, dry lining, taping and jointing, suspended ceilings and fire curtains for a Co-op Funeralcare fit-out on Morden Road, Mitcham, south London. The main contractor was Kingfisher Construction and the architect was Bowman Riley. Our team started on site in August 2026 and completed the package in November 2026.
Client
Co-op Funeralcare
Location
Morden Road, Mitcham, south London
Duration
August to November 2026
Main contractor
Kingfisher Construction
Architect
Bowman Riley
Services delivered
Sector
Manufacturers
The brief
Kingfisher Construction appointed Eastledge to deliver the internal partitions, dry lining, taping and jointing, suspended ceilings and fire curtains for a Co-op Funeralcare premises on Morden Road, Mitcham, south London. Bowman Riley was the architect. The fit-out was registered under BREEAM Refurbishment and Fit Out 2014, targeting Very Good.
The building brings together clinical and hygiene-critical rooms, ground-floor public and admin spaces, and first-floor staff areas. That called for fire-rated and acoustic partitions where the specification required them, a cleanable ceiling finish in the hygiene areas, and a consistent commercial finish through the corridors and public rooms.

Scope
Our team supplied and installed metal stud partitions and linings, including 30 to 120 minute fire-rated walls, acoustic partitions, linings and ply pattressing; taping and jointing to a Level 3 finish; a first-floor plasterboard bulkhead; suspended ceilings; and fire curtains. The walls, plasterboard, taping and jointing, and suspended ceilings ran through the clinical rooms, the ground-floor public and admin spaces, the corridors and the first-floor staff areas.
Hygienic wall cladding on the project was carried out by others and was not part of the Eastledge package.
Products
The partition and dry lining package used Siniat GTEC Standard Board, Siniat GTEC dB Board and Siniat Fire Core Board, with Knauf Soundshield Plus 15 mm in the acoustic wall type. Metalwork was Hadley and Metsec Speedline, with Superglass APR insulation.
Suspended ceilings were installed as Rockfon Artic A24 and Rockfon CleanSpace Essential A24, both 600 x 600 square edge, on a Rockfon T24 grid. Anti-corrosive T24 grid was used where the specification required it.
Fire curtains were Firefly Apollo Lite.
The challenge
The main challenge was design changes throughout the build, in particular the deflection design. The portal frame had more movement than a standard partition head could take, so a non-standard deflection head detail had to be developed with Kingfisher Construction, Bowman Riley and the structural engineer while our team was already on site. Manufacturer head details were needed for the walls affected by that movement, including walls under the mezzanine.
Our team reduced labour on site while the detail was being resolved, then built to the agreed head detail once it was confirmed, boarding to the deflection level and sealing the heads so the detail was not compromised. The deflection design also meant some partition types were changed from Hadley to Speedline metal. Bowman Riley issued revised drawings for the affected wall types, and our team agreed the revised types with the design team, including the acoustic performance required for BREEAM.
Separately, the specified ceiling tiles were not available. Our team installed Rockfon Artic A24 and Rockfon CleanSpace Essential A24 as the agreed alternatives, on Rockfon T24 grid. The change was confirmed as compatible with the targeted BREEAM credits, and Bowman Riley issued an updated ceiling plan.
Delivery
Work started on site in August 2026 and completed in November 2026. The package was sequenced with the main contractor's programme, including the mechanical and electrical first fix above the ceilings.
Outcome
The Co-op Funeralcare premises on Morden Road, Mitcham, was completed with Eastledge's partitions, dry lining, taping and jointing, suspended ceilings and fire curtains in place. Kingfisher Construction was the main contractor and Bowman Riley was the architect. The package ran from August to November 2026.
Further context is on Dry Lining, Partitions, Fire-Rated Partitions, Suspended Ceilings and London. This funeral care fit-out is separate from the Co-op retail refurbishment programme.
Get in touch
Planning a similar project?
We work with estates teams, main contractors and designers across education, healthcare and commercial. Tell us about your brief and we'll come back quickly with a clear next step.
Where this sits
Services, areas and contractor packages
Services on this project
Service pages for this area
Location pages
For main contractors
Related projects
More work like this
retailMatalan Aylesbury: fire-rated partitions and FR ceilings
Matalan · Aylesbury
Full-height metal stud partitions, 60 minute and 30 minute fire-rated walls, firestopping and Knauf AMF Thermatex Fine Stratos one hour FR tiles on FR grid at Matalan Aylesbury, delivered for White Box Interiors.
View case study
retailMatalan Bangor: fire-rated partitions and FR ceilings
Matalan · Springhill Retail Shopping Centre, Bangor, Northern Ireland
Metal stud partitions, one hour and half hour fire-rated walls, taping and jointing, fire barriers and Knauf Ceiling Solutions AMF Thermatex Fine Stratos one hour FR tiles on fire-rated grid at Matalan Bangor, delivered for White Box Interiors.
View case study
retailSuperdrug Newport, Isle of Wight: dry lining, fire-rated partitions and suspended ceilings
Superdrug · St Georges Way, Newport, Isle of Wight
Dry lining, a two hour fire-rated Tradeline and Siniat wall, fire curtains, taping and jointing, and TVS Cleancare ceilings on Rockfon T24 Click grid at the new Superdrug store in Newport, Isle of Wight, delivered for Vale (UK) Ltd in ten days on site.
View case study
Get in touch
Looking for similar work in retail?
Tell us about the building, the programme and your priorities. We'll come back with a clear next step within one working day.